国产亚洲精品AA片在线播放天,无码精品国产一区二区三区免费,特殊按摩让少妇高潮连连

                                  < project | Previous project >

                                  Nepal: Design and Construction Supervision of Melamchi Headworks and Diversion Tunnel

                                  Eptisa will provide project management assistance, including design review and construction supervision, for the Melamchi Diversion Scheme Construction. This project aims to divert 510 MLD raw water from the Melamchi Valley to the Kathmandu Valley through a 26.1 km tunnel, the construction of 43 km of access roads and the upgrade of 29 km of roads for the construction and maintenance of facilities, as well as the construction of a water treatment plant with an initial capacity of 170 MLD.
                                  国产亚洲精品AA片在线播放天,无码精品国产一区二区三区免费,特殊按摩让少妇高潮连连